You use this program to view resource components held in the resource planning demand file. The quantities required for each resource can be displayed in a graphical format or in detail.
You use the Resource Explosion program to create a resource planning demand file.
Field | Description |
---|---|
Preference | |
Save preference | Select this to save the preferences you indicated in
the preference pane against your operator code. If you do not select this option, then the preferences are saved for the current run of the program only. |
Resource | Indicate the resource for which you want to view the planning. |
You use this pane to indicate the defaults you want to apply when displaying the resource planning.
Field | Description | ||||||||
---|---|---|---|---|---|---|---|---|---|
Graphical Display Option | |||||||||
Graphical option | Your selection here affects what is displayed in the
MRP Resource Graph Details
pane.
|
||||||||
Time period | |||||||||
Days per period | You use this field to indicate the number of days required for each time period. This defaults to your entry at the option: Default time period length (Requirements Planning Setup). | ||||||||
First period start date |
You use this field to indicate the date from which the first period must begin. Any resources required up to the date entered become prior while any resources required after the 11th period become forward requirements. |