You use this program to view material allocations of stock codes to jobs.
Field | Description |
---|---|
Include | |
Completed Allocations |
Completed jobs or completed allocations for jobs are excluded from the listview by default. Enable this to include completed allocations in the listview. |
Query | |
Job Query | Displays detailed information for the job currently highlighted in the listview using the WIP Query program. |
Column | Description |
---|---|
Cost | Costs are only displayed when the field: Show costs in Inventory/WIP is allowed (Security Fields). |
Date required | Indicates the date by which the material is required for the manufacture of the parent part. This is based either on the operation to which it is assigned, or a number of days before the delivery date of the job. |
ECC consumption | The ECC consumption method for an ECC controlled item is displayed. |
This program can be accessed by selecting the Allocations option from theProduction pane of the Inventory Query program.