You use this program to generate a report listing the status of each job currently held on file.
Field | Description | ||||
---|---|---|---|---|---|
Print options | |||||
Sub jobs under master jobs |
Select this to print details for jobs occurring at all levels within a job structure. If you select this option, then details of master, sub and interim jobs are included on the report. |
||||
Only completed jobs with WIP values | Select this to include only completed jobs that have
WIP values. Note that the check for this option only applies to Master jobs. Therefore, if you select this option together with the option: Sub jobs under master jobs, then details of sub jobs and interim jobs are listed irrespective of whether or not these are complete or have WIP values. |
||||
New page per job | Select this to print the information for each job on a new page. | ||||
Values |
Select this to print the following additional information on the report:
|
||||
Print manufacturing u/m quantities | This applies if you are using Manufacturing
unit of measure (WIP Setup - General
2 tab). In addition, you need to have defined a
Manufacturing unit of measure for the
relevant stock items (Stock Code Maintenance) and used the
Manufacturing unit of measure in the
Bills of Materials. Select this to print the manufacturing unit of measure for the quantities on the report. If you do not select this option, then the stocking unit of measure for the quantities is printed. |
||||
Jobs on hold | |||||
Include | Select this to include jobs on hold. | ||||
Exclude | Select this to exclude jobs on hold. | ||||
Only | Select this to only include jobs on hold. | ||||
Completed jobs |
You cannot access this field if you selected the option: Only completed jobs with WIP values. |
||||
Include | Select this to include completed jobs. | ||||
Exclude | Select this to exclude completed jobs. | ||||
Only | Select this to only include completed jobs. | ||||
Unconfirmed jobs | |||||
Include | Select this to include unconfirmed jobs. | ||||
Exclude | Select this to exclude unconfirmed jobs. | ||||
Only | Select this to only include unconfirmed jobs. | ||||
Values by | |||||
Notional part |
Select this to print the values for each notional part. These are the total work in progress values of materials and labor for the notional part. |
||||
Co-product | Select this to print the details for each co-product attached to a notional part on the report. |
Field | Description |
---|---|
Job selection | Indicate the job(s) for which you want to generate the report. |
Job classification | Indicate the job classes for which you want to include jobs in the report. |
Customer selection | Indicate the customer(s) for which you want to include jobs in the report. |
Stock code selection | Indicate the stock item(s) for which you want to include jobs in the report. |
The options on this tab page enable you to indicate date(s) according to which you want to generate the report.
These options enable you to apply a theme to the report and to define multiple output destinations for the report once it has been compiled (SRS Output Options).
For each material allocation, the report indicates the quantity and value originally required and the quantity and value actually issued to date.
For each operation, the report indicates the run and setup times originally required and the time actually booked to date.
If you selected the Print option: Sub jobs under master jobs, then the <mast> field indicates that the job is a master job; the <sub> field indicates that the job is a sub job; and the <int> field indicates an interim job (i.e. a sub job to which is attached other sub jobs).