You use this program to view and maintain details of the co-products in a job.
Field | Description |
---|---|
Edit | |
Change | Select this to maintain the description and cost
apportionment details for the co-product currently highlighted
in the listview. This option is only enabled when the WIP Co-products for Job program is accessed from the Browse on Jobs program. |
Edit | Select this to use the Multimedia program
to maintain multimedia objects for the co-product currently
highlighted in the listview. This option is only enabled when the WIP Co-products for Job program is accessed from the Browse on Jobs program. |
Detail Costs | Select this to maintain the detail cost percentages for
the co-product. This option is only enabled if detail costing was selected for the co-product (BOM Co-products). |
Maintain Reserved Lots/Serials | Select this to use the Parent/Lot Serial Reservation program
to reserve lots and/or serials for the co-product. This option is only enabled if the co-product is defined as traceable or serialized (Stock Code Maintenance - Tracking tab) and you indicated that you want to reserve lots/serials for co-products (WIP Setup - Lots and Serials tab). |
Maintain Tracked Lots |
Select this to use the Track Component Lots and Serials to Parent program to view and maintain the link of lot numbers of component parts to the parent part. This option is only enabled if you selected the option: Require component to parent lot tracking (WIP Setup - Lots and Serials Tab). |
Maintain Tracked Serials |
Select this to use the Track Component Lots and Serials to Parent program to view and maintain the link of serial numbers of component parts to the parent part. This option is only enabled if you selected the option: Require component to parent serial tracking (WIP Setup - Lots and Serials Tab). |
Functions | |
Reserve Lots Query | Select this to use the Reserved Lots for Job program to view all the reserved lots for the co-product. This option is only enabled if the co-product is defined as traceable (Stock Code Maintenance - Tracking tab) and you indicated that you want to reserve lots for co-products (WIP Setup - Lots and Serials tab). |
Reserve Serials Query | Select this to use the Reserved Serials for Job program
to view all the reserved serials for the co-product.
This option is only enabled if the co-product is defined as serialized (Stock Code Maintenance - Tracking tab) and you indicated that you want to reserve serials for co-products (WIP Setup - Lots and Serials tab). |
This screen is displayed when you select the Change option from the Edit menu.
Field | Description |
---|---|
Co-product line | This indicates the co-product line you are currently maintaining. |
Co-product Maintenance | |
Stock description | This indicates the description for the co-product, but can be changed. |
Cost apportionment percentages | The total percentages for all co-products must be
100%. A percentage must be defined against each of the Material, Labor and Subcontract fields, irrespective of whether your Cost apportionment method is set to Detail (Setup Options). Cost apportionments cannot be maintained for a completed job. |
Material | You use this field to enter the percentage of the cost of materials that applies to the co-product. |
Labor | You use this field to enter the percentage of the cost of labor that applies to the co-product. |
Sub-contract | You use this field to enter the percentage of the cost of subcontract operations that applies to the co-product. |
Apportionment percentage totals | These fields are displayed for information purposes only and cannot be maintained. |
Total material | This indicates the current cumulative material cost percentages apportioned to the co-products of the job. |
Total labor | This indicates the current cumulative labor percentages apportioned to the co-products of the job. |
Total subcontract | This indicates the current cumulative subcontract percentages apportioned to the co-products of the job. |
This screen is displayed when you select the Detail Costs option from the Edit menu.
Field | Description |
---|---|
Edit | |
Add | Select this to add a cost apportionment to the job. |
Change | Select this to maintain the currently highlighted cost apportionment for the job. |
Delete | Select this to delete the currently highlighted cost apportionment from the job. |
Options | |
Confirm Deletions | Select this if you want to be prompted to confirm the deletion of a cost apportionment. If you do not select this option, then the cost apportionment is deleted immediately you select to delete it. |
This screen is displayed when you select to Add or Change the cost apportionment for a component or operation against a job.
Field | Description |
---|---|
Co-product line | This indicates the co-product line for which you are maintaining cost the apportionment. |
Stock code | This indicates the stock code and description of the co-product. |
Percentage | Enter the cost apportionment percentage for the co-product for the selected operation/component. |
Total apportioned | This indicates the total apportionment for the
components/operations. If this value is not 100% when you have completed the cost apportionments for the components/operations to the co-products, then the following message is displayed: "The cost apportionment for the selected component/operation is not 100%. Do you want to balance the apportionment?" If you select OK, then the apportionment of the attached co-products is proportionately raised to meet the 100% total required. For example: If you defined a 20% apportionment to each of four co-products for a specific component or operation, then selecting OK at the message prompt will cause the system to change the apportionment to 25% against each co-product for that operation or component. |
Save | Select this to save the percentage apportionments allocated to the component/operation. |
Close | Select this to return to the previous screen. |
When creating a job for a notional part, the material and labor allocations are dependant on the co-product types and quantities included against the notional part.
The material and labor allocations are explained using an example.
Example:
The following bill of materials was created:
Notional part N (qty per 1) with three co-products (A, B and C) attached.
Component C1 (qty per 30)
Component C2 (qty per 60)
Component C3 (qty per 10)
By product Z (qty per -15)
You use the BOM Co-products program to apportion the percentage of materials associated with each co-product.
In this example, the percentage apportionment of materials associated with each co-product are as follows:
Co-product | Qty per of N | Material Apportionment % | Labor Apportionment % | Subcontract Apportionment % |
---|---|---|---|---|
A | 10 | 50 | 25 | 0 |
B | 10 | 0 | 50 | 100 |
C | 20 | 50 | 25 | 0 |
Each apportionment (material, labor and subcontract) must add up to 100% (i.e. total material apportionment percentage for co-product A + B + C = 100%; total labor apportionment percentage for co-product A + B + C = 100% and total subcontract apportionment percentage for co-product A + B + C = 100%). |
Applying the percentage apportionments of materials, the quantities associated with each co-product are as follows:
Co-product A:
Component | Qty per of N | Qty (10 * A) 50% | Qty Per - Co-product A |
---|---|---|---|
C1 | 30 | 15.000 | 1.500 |
C2 | 60 | 30.000 | 3.000 |
C3 | 10 | 5.000 | .500 |
Z | -15 | -7.500 | -0.75 |
Co-product B has no material cost apportionment, so no materials are apportioned to it.
Co-product C:
Component | Qty per of N | Qty (20 * C) 50% | Qty Per - Co-product C |
---|---|---|---|
C1 | 30 | 15.000 | 0.750 |
C2 | 60 | 30.000 | 1.500 |
C3 | 10 | 5.000 | 0.250 |
Z | -15 | -7.500 | -0.375 |
The same logic is applied to the internal and subcontract operations, giving the following apportionments for operations:
Component | Qty/Run of N | Co-product A (10 of) | Co-product B (10 of) | Co-product C (20 of) |
---|---|---|---|---|
Op 1 | 6.00 hours | 1.5 hours (25%) | 3 hours (50%) | 1.5 hours (25%) |
Op 2 (subcontract) | 50.00 (monetary value) | 0 (0%) | 50.00 (monetary value) (100%) | 0 (0% |
Note that co-product B has 100% apportionment for the subcontract operation.
If we selected to enter the co-product quantities to make (WIP Setup - Job Creation tab), then not only is the notional part quantity to make calculated, but also the material quantity per and the labor run time.
For example:
We create a job and enter the co-product quantities to make as follows:
Quantity Entered | Calculated Co-product A | Calculated Co-product B | Calculated Co-product C | Calculated Notional Part N |
---|---|---|---|---|
10 (co-product A) | 10 (entered) | 10 | 20 | 1 |
20 (co-product B) | 20 | 20 (entered) | 40 | 2 |
10 (co-product C) | 5 | 5 | 10 (entered) | 0.5 |
Example 1 - Excluding a co-product from manufacture
If the co-products are defined as optional (BOM Co-products) and we enter the co-products as follows:
Co-product A - 0 (excluded)
Co-product B - 20 (10 per notional part)
Co-product C - 40 (20 per notional part)
The calculated notional quantity is 2 (based on either co-product B or C)
Component | Normal Qty per of N | Normal Total | Adjusted Total (50%) | New Qty Per |
---|---|---|---|---|
C1 | 30 | 60.000 | 30.000 | 15.000 |
C2 | 60 | 120.000 | 60.000 | 30.000 |
C3 | 10 | 20.000 | 10.000 | 5.000 |
Z | -15 | -30.000 | -15.000 | -7.500 |
Because co-product A takes 50% of all material apportionment, the quantities are reduced by 50% across the board. If co-product B were excluded, then the quantities would not change, as 0% of the components are apportioned to co-product B. |
Using the same example and applying this to the operations, the results are:
Operation | Normal Run | Normal Total | Adjusted Run | New Qty Per |
---|---|---|---|---|
Op 1 | 6 hours | 12 hours | 9 hours (75%) | 4.5 hours |
Op 2 | 50.00 (monetary value) | 100.00 (monetary value) | 100.00 (monetary value) | 50.00 (monetary value) |
Note: Co-product A takes 25% of internal operation Op 1, so the run time is reduced by 3 hours, but because 0% of the subcontract operation Op 2 is apportioned to co-product A, the value remains the same, even though co-product A was excluded from the build.
If co-product B were to be excluded from the build, then only one operation Op 1 would be created as Op 2, the subcontract operation, only applies to co-product B which was excluded.
Because co-product A was excluded from the build, the apportionment percentages no longer add up to 100% ans these must now be recalculated.
The new apportionments against the co-products is as follows:
Co-product | Qty per of N | Material Apportionment % | Labor Apportionment % | Subcontract Apportionment % |
---|---|---|---|---|
B | 10 | 0 | 66.667 | 100 |
C | 20 | 100 | 33.333 | 0 |
A proportional type of co-product can be used to define the limits of how many of each co-product can be defined against each notional part. In this environment imagine the notional part being a physical ‘constraint’ such as an anodizing bath or a pottery oven.
Both of these constraints are limited by the volume of items (not necessarily the quantity as each item requires more or less space) that can be processed at any one time.
In this example the co-products are cups and saucers that need glazing in a pottery oven. The notional part is the pottery oven and the co-product quantities and apportionment percentages are as follows:
Co-product | Quantity per | Proportional Percentage |
---|---|---|
Cup | 50 | 25% |
Saucer | 50 | 75% |
In a single normal run (i.e. for each notional part) you can glaze 50 cups and 50 saucers at a time.
The proportional percentage of each co-product means that the 50 cups only take up 25% of the capacity of the oven and the 50 saucers take up 75%.
If you were to do a run of cups only, then the total would be calculated as: (1/0.25) x 50 = 200
If you were to do a run of saucers only, then the total would be calculated as: (1/0.75) x 50 = 66.66667 or 66. The reason for this is that if we rounded the saucers up to 67, then the limit of 100% would be exceeded. The total percentage on proportional items can, however be less than 100%, but not more.
If you exclude the saucers then the proportion of the quantity percentage would only be 25%. What this means is that you could adjust the quantity per of the cups so as to utilize the full capacity of the oven.
In this example to increase the proportional quantity percentage back up to 100% you could glaze 200 cups per oven.
If you were to do a run of cups only, then the total would be calculated as: (1/0.25) x 50 = 200
Likewise were you to do a run of saucers only then you could glaze a total of 66 per oven.
If you were to do a run of saucers only, then the total would be calculated as: (1/0.75) x 50 = 66.66667 or 66. The reason for this is that if we rounded the saucers up to 67, then the limit of 100% would be exceeded.
It is important to note that the total percentage on proportional items cannot exceed 100%, however it can be less than 100%.
This program can be accessed by:
selecting the Maintain Co-products option from the Edit menu of the Browse on Jobs program.
selecting the Co-products link from the Additional Information pane of the WIP Query program.
selecting the Maintain Detailed Costing option from the Edit menu of the Material Allocations program.
Electronic Signatures provide security access, transaction logging and event triggering. This enables you to increase control over your system changes.
Access to the following eSignature transactions within this program can be restricted at Operator, Group, Role or Company level. You configure this using the Electronic Signatures program.
eSignature Transaction | Description |
---|---|
WIP Change co-product for job |
Controls access to the maintenance of co-products for a job in the WIP Co-products for Job program. |